Technology Philosophy
Technology serves nature, not the other way around. We integrate innovation thoughtfully to enhance restoration effectiveness while maintaining ecological integrity.
Core Principles:
- Purpose-Driven: Every tech serves restoration goals
- Appropriate Scale: Right-sized for our needs
- Sustainable: Low environmental impact
- Reliable: Proven technologies prioritized
- Accessible: Simple enough for community use
- Bootstrap-First: Start minimal, expand thoughtfully
- Adaptive: Technology choices match budget and location realities
Adaptive Technology Framework
Vision: Reliable off-grid infrastructure supporting restoration work and comfortable living
Core Requirements (non-negotiable):
- Safe, code-compliant installations (no fire/shock hazards)
- Sufficient power/water for basic living and essential restoration work
- Maintainable by founders (DIY-friendly or local service available)
- Within available budget constraints
- Low ongoing operational costs
Flexibility Principles:
- Budget determines technology tier (minimal → comprehensive)
- Location determines water/climate strategies (temperate vs Mediterranean)
- Defer exact specifications until site and budget confirmed
- Start minimal, expand based on actual needs vs assumptions
⚡ Solar Energy & Off-Grid Power - Adaptive Options
Vision: Reliable Off-Grid Power
Core Requirements:
- Power for essential living: lighting, phone charging, laptop, basic fridge
- Safe installation meeting electrical codes
- Sufficient winter production (lowest solar months)
- Battery backup for 3-5 cloudy days minimum
- Expandable as needs grow
Realistic Daily Power Needs (1-2 people off-grid):
| Device | Usage Pattern | Daily Consumption |
|---|---|---|
| Laptops (2) | Variable use, not 24/7 | 100-150 Wh/day |
| Internet router | 5-10W continuous | 50-100 Wh/day |
| Starlink dish | 50-80W average | 80-120 Wh/day |
| LED lights | 30W × 2-3 hours actual | 50-100 Wh/day |
| Refrigerator | Efficient model, duty cycle | 500-800 Wh/day |
| Water pump | Occasional use | 50-100 Wh/day |
| Phone charging | 2 phones daily | 20-30 Wh/day |
| Misc devices | Tools, fans, appliances | 100-200 Wh/day |
Total Daily Consumption: 1.5-2.5 kWh typical, 3-4 kWh peak days
Option A: Minimal Off-Grid Setup (€800-1,500)
Summary: Ultra-basic power for lighting, phones, laptop only
System Specs:
- Solar: 200-300W panels (1-2 panels)
- Battery: 100-200Ah (1.2-2.4 kWh)
- Inverter: 300-500W pure sine wave
- Charge controller: Basic PWM or small MPPT
Powers:
- ✅ LED lights throughout house
- ✅ Phone and laptop charging
- ✅ Small water pump (occasional use)
- ❌ No refrigerator
- ❌ No power tools
- ❌ No internet router/Starlink (unless very minimal use)
Cost Breakdown:
- Panels: €150-300
- Battery: €250-500
- Inverter: €100-200
- Controller: €50-100
- Mounting/wiring: €150-300
- Installation: DIY
- TOTAL: €800-1,500
Pros:
- Very low cost, affordable on tight budget
- Easy DIY installation
- Sufficient for very simple living
- Can expand later by adding panels/batteries
Cons:
- No fridge (food preservation challenging)
- Limited to basic devices only
- Struggles in winter (may need generator backup)
- Not suitable for full-time comfortable living
Best If:
- Total budget is very constrained (€8-12k total)
- Living extremely simply Year 1
- Can tolerate no refrigeration or use propane fridge
- Plan to expand system in Year 2
Status: Fallback option if crowdfunding/grants fall short
Option B: Basic Comfort Setup (€3,000-5,000)
Summary: Adequate power for comfortable off-grid living and light restoration work
System Specs:
- Solar: 1-2 kW panels (3-5 × 400W panels)
- Battery: 400-600Ah (5-7 kWh LiFePO4)
- Inverter: 2-3 kW pure sine wave
- Charge controller: MPPT 40-60A
- Basic monitoring display
Powers:
- ✅ All Option A devices
- ✅ Small refrigerator (efficient model)
- ✅ Internet router + Starlink (full-time)
- ✅ Occasional power tool use (drill, small saw)
- ✅ 3-5 day battery backup
- ⚠️ Limited heavy tools or simultaneous high loads
Cost Breakdown:
- Panels: €900-1,800
- Battery: €1,500-2,500
- Inverter/charger: €500-800
- MPPT controller: €200-400
- Mounting/wiring: €300-500
- Installation: Mostly DIY + electrician for final connections (€200-500)
- TOTAL: €3,600-6,500
Realistic Budget: €4,000-5,000 with mix of DIY + professional help
Pros:
- Comfortable living possible year-round
- Refrigeration for food security
- Internet for work and communication
- Adequate winter production (with conservative usage)
- Good balance of cost vs capability
- Expandable by adding panels or second battery
Cons:
- Not enough for heavy power tools daily
- Limited washing machine use (if added later)
- Still need careful energy management in winter
- Professional help needed for some installation
Best If:
- Total budget €15-20k (allows €4-5k for power)
- Balanced approach: comfort + affordability
- Part-time work model (not intensive power tool use daily)
- Planning gradual expansion over 2-3 years
Status: Most likely target if crowdfunding reaches €15-20k
Option C: Full Off-Grid Setup (€8,000-14,000)
Summary: Comprehensive power for full comfort, heavy tools, future-proof
System Specs:
- Solar: 3-5 kW panels (8-12 × 400W panels)
- Battery: 10-15 kWh LiFePO4 (dual bank possible)
- Inverter: 5 kW pure sine wave
- MPPT controller: 80-100A
- Monitoring system with display/app
Powers:
- ✅ All Option B devices
- ✅ Heavy power tools regularly (saw, drill, grinder)
- ✅ Large fridge/freezer
- ✅ Washing machine (if added)
- ✅ Workshop equipment
- ✅ 5-7 day battery backup
- ✅ Surplus production (potential future grid sale)
Cost Breakdown:
- Panels: €2,400-4,800
- Battery: €3,000-6,000
- Inverter/charger: €1,200-2,000
- MPPT controller: €400-800
- Mounting/wiring: €800-1,500
- Installation: Professional help required (€1,000-2,000)
- TOTAL: €8,800-17,100
Realistic Budget: €10,000-14,000 with professional installation
Pros:
- No power limitations for planned activities
- Excellent winter performance (adequate production even December)
- Future-proof for 5-10 years
- Potential grid-tie and feed-in revenue (if regulations allow)
- High reliability and autonomy
- Professional installation ensures safety/compliance
Cons:
- High upfront cost
- Complex system (requires professional installation/commissioning)
- May be oversized for actual Year 1-2 needs
- Takes significant portion of total budget
Best If:
- Total budget €25-30k+ (can allocate €10-14k to power)
- Major grant or crowdfunding success
- Planning long-term (5+ years at site)
- Want maximum independence and reliability
- Revenue model includes workshops/events needing power
Status: Aspirational if crowdfunding exceeds €25k or major grant awarded
Option D: Grid Connection OR Hybrid
Summary: Grid connection as primary or backup, with smaller solar supplement
System Specs (Hybrid model):
- Solar: 1-2 kW panels (supplement only)
- Grid connection: Primary power source
- Small battery: 2-5 kWh (grid backup, not off-grid autonomy)
- Grid-tied inverter OR hybrid inverter
Cost:
- Solar (small): €1,500-3,000
- Grid connection fees: €500-3,000 (location-dependent)
- Hybrid inverter: €1,000-2,000
- Installation: €500-1,500
- TOTAL: €3,500-9,500
Plus Ongoing:
- Grid monthly fees: €15-40/month (€180-480/year)
- Electricity usage: €30-80/month (€360-960/year)
- Annual: €540-1,440
Pros:
- Reliability (grid backup always available)
- Simpler system than full off-grid
- Lower battery cost (smaller capacity needed)
- No winter production anxiety
- Potential feed-in revenue from surplus solar
Cons:
- Monthly grid fees forever
- Dependent on grid availability and stability
- Less independence
- Bureaucracy/permits for grid connection
- Not viable if site has no grid access
Best If:
- Site has grid access available
- Grid connection cost is reasonable (< €2,000)
- Prefer reliability over independence
- Regulations allow grid connection at reasonable cost
- Want backup security of grid
Status: TBD based on site selection - Only viable if grid accessible
Solar Decision Criteria
Choose between options based on:
-
What's total budget after land purchase?
- < €12k total → Option A (minimal)
- €15-20k total → Option B (basic comfort)
- €25-30k total → Option C (full setup)
- Variable → Consider Option D if grid available
-
Is grid available at selected site?
- Yes + grid connection < €2k → Option D strong candidate
- No → Must choose A, B, or C (off-grid)
-
What are actual daily power needs?
- Very basic (no fridge, minimal devices) → Option A sufficient
- Comfortable living + light work → Option B adequate
- Heavy tools, workshops, events → Option C needed
-
Can we install ourselves or need professional?
- DIY capable → Options A or B (cost savings)
- Need professional → Options C or D (budget for installation)
-
Timeline and expansion plans?
- Quick start, expand later → Option A or B, add panels Year 2
- Long-term setup (5+ years) → Option C (future-proof)
Current Status:
- Decided: Off-grid solar required (assume no grid access until site confirmed)
- TBD: Exact option (A/B/C/D) pending total budget and site selection
- Most Likely: Option B (€4-5k) if crowdfunding reaches €15-20k target
- Decision timing: Finalize 2-4 weeks after site secured and budget confirmed
Detailed Specifications: Deferred until option selected - Exact panel brands, battery models, inverter specs determined at purchase time based on best available products and prices
💧 Water Systems - Location-Adaptive Strategies
Vision: Reliable Water Supply for Living and Restoration
Core Requirements:
- Potable water for drinking and cooking (safe filtration)
- Sufficient water for basic hygiene and sanitation
- Irrigation water for plant establishment (Year 1-2, then minimal)
- Legal compliance (water rights, quality standards)
- Affordable ongoing costs
Climate-Adaptive Water Strategies
Water systems must adapt to location rainfall patterns:
TEMPERATE CLIMATE (Germany, Northern France, etc.)
Climate Data:
- Rainfall: 700-800 mm/year
- Distribution: Year-round, slight summer low
- Challenges: Winter freeze (storage protection needed)
Rainwater Potential (20 m² roof catchment):
- 20 m² × 700 mm = 14,000 L/year theoretical
- Actual collection: 10,000-12,000 L/year (accounting for losses)
MEDITERRANEAN CLIMATE (Portugal, Spain, Southern France, Italy)
Climate Data:
- Rainfall: 400-600 mm/year
- Distribution: Winter-focused (Oct-Mar), summer drought
- Challenges: Summer deficit, intense storms, high evaporation
Rainwater Potential (20 m² roof catchment):
- 20 m² × 500 mm = 10,000 L/year theoretical
- Actual collection: 7,000-9,000 L/year (accounting for losses)
Water Usage Budget (Location-Independent)
Daily Consumption (2 people):
- Drinking & cooking: 10-15 L/day
- Washing & cleaning: 30-50 L/day
- Toilet (composting reduces to ~5 L/day): 5-10 L/day
- Total indoor: 45-75 L/day = 16,000-27,000 L/year
Irrigation (Growing Season):
- Nursery/seedlings: 20-50 L/day (3-4 months)
- Establishment watering: 50-100 L/day (peak summer, 2-3 months)
- Mature plants: Minimal (rain-dependent)
- Annual irrigation: 5,000-15,000 L/year
Total Annual Need: 21,000-42,000 L/year
Option A: Rainwater + Delivery (Temperate Climate)
Summary: Rainwater primary, delivery supplements gaps
System Design:
- Roof catchment: 20-30 m² (tiny house)
- Collection: Gutters, downspouts, first-flush diverter
- Storage: 3-4 × IBC tanks (3,000-4,000 L capacity)
- Filtration: Sediment + activated carbon + optional UV
- Freeze protection: Insulated tanks or indoor storage
Budget:
- IBC tanks (4×): €200-800
- Gutters & downspouts: €100-200
- First flush diverter: €30-80
- Filtration system: €200-500
- Freeze protection: €100-300
- Plumbing & fittings: €100-200
- TOTAL: €730-2,080
Water Balance (Temperate 700mm):
- Collected: 10,000-12,000 L/year
- Need: 21,000-42,000 L/year
- Gap: 9,000-32,000 L/year
- Delivery: 10-30 loads × €50-150 = €500-4,500/year
Realistic Annual Cost: €1,000-2,500/year for delivery
Pros:
- Low upfront cost (< €2k setup)
- Simple, maintainable system
- Rainwater covers 25-50% of needs
- Delivery fills gaps predictably
- Proven approach, low risk
Cons:
- Ongoing delivery costs (€1-2.5k/year)
- Dependent on delivery service availability
- Storage space required (IBC tanks visible)
- Freeze risk in winter (protection needed)
Best If:
- Operating in temperate climate (Germany, etc.)
- Tight budget (< €2k for water setup)
- Delivery service accessible at site
- Can tolerate ongoing annual costs
Status: Default for Germany or temperate locations
Option B: Rainwater + Delivery (Mediterranean Climate)
Summary: Same system as Option A, adapted for Mediterranean conditions
System Design: (Same as Option A, with adaptations)
- Larger storage (5-6 × IBC = 5,000-6,000 L) to capture winter rains
- Overflow management for intense storms
- No freeze protection needed
- Shading for tanks (reduce evaporation and algae)
Budget:
- IBC tanks (5-6×): €250-1,000
- Gutters & downspouts: €100-200
- First flush diverter: €30-80
- Filtration system: €200-500
- Tank shading: €50-150
- Plumbing & fittings: €100-200
- TOTAL: €730-2,130
Water Balance (Mediterranean 500mm):
- Collected: 7,000-9,000 L/year
- Need: 21,000-42,000 L/year (higher irrigation in drought climate)
- Gap: 12,000-35,000 L/year
- Delivery: 12-35 loads × €50-150 = €600-5,250/year
Realistic Annual Cost: €1,500-3,500/year for delivery (higher than temperate)
Pros:
- Low upfront cost (< €2.5k setup)
- No freeze risk (simpler winterization)
- Captures winter rains effectively
- Delivery fills summer deficit
Cons:
- Higher ongoing delivery costs (€1.5-3.5k/year) due to lower rainfall
- More dependent on delivery (rainwater covers only 20-40%)
- Summer drought stress requires careful planning
- Irrigation needs higher in summer heat
Best If:
- Operating in Mediterranean climate (Portugal, Spain, etc.)
- Tight budget (< €2.5k for water setup)
- Can tolerate higher annual delivery costs
- Site access allows delivery trucks
Status: Default for Portugal, Spain, or Mediterranean locations
Option C: Well Drilling (Location-Dependent)
Summary: Drill well for self-sufficient groundwater supply
System Design:
- Well drilling: Depth varies (10-100m depending on aquifer)
- Submersible pump: 12V DC or 230V AC (solar-powered)
- Pressure tank: 50-100L
- Filtration: Sediment + carbon (taste/odor)
- Backup: Rainwater system (Option A/B) for redundancy
Budget:
- Well drilling: €3,000-10,000 (highly location-dependent)
- Pump + pressure system: €500-1,500
- Filtration: €200-500
- Backup rainwater (minimal): €500-1,000
- TOTAL: €4,200-13,000
Annual Cost: €50-200 (electricity for pump, filter replacements)
Pros:
- Self-sufficient water supply (no delivery dependency)
- Very low ongoing costs after initial investment
- Reliable year-round (aquifer-dependent)
- Can support larger irrigation needs
- Property value increase (well on land)
Cons:
- High upfront cost (€4-13k)
- Requires aquifer at site (not always available)
- Drilling uncertain (may not find water, or poor quality)
- Permitting required in most countries
- Maintenance (pump replacement every 10-15 years)
Best If:
- Site confirmed to have aquifer (geological survey)
- Budget allows €5-10k for water setup
- Long-term plan (5+ years) justifies investment
- Delivery not reliably available at remote site
- Regulations permit private well drilling
Status: TBD based on site selection - Depends on geological survey and budget
Option D: Municipal Water Connection
Summary: Connect to municipal water supply if available at site
System Design:
- Water connection to nearest municipal line
- Meter installation
- Interior plumbing to house and irrigation
- Backup rainwater (optional, for irrigation only)
Budget:
- Connection fee: €500-5,000 (distance-dependent)
- Plumbing: €500-1,500
- Meter + installation: €200-500
- TOTAL: €1,200-7,000
Annual Cost:
- Monthly fees: €10-30/month (€120-360/year)
- Usage (20-40 m³/year): €60-200/year
- Annual: €180-560/year
Pros:
- Reliable, unlimited supply
- Low ongoing cost compared to delivery
- Simple system (no complex filtration)
- No freeze/drought concerns
- Potable quality guaranteed
Cons:
- High connection cost if far from municipal line
- Monthly fees forever
- Dependent on municipal infrastructure
- Not available at most rural/restoration sites
- Less independent
Best If:
- Site has municipal water access within 100-200m
- Connection cost reasonable (< €2,000)
- Prefer reliability over independence
- Regulations allow connection
Status: TBD based on site selection - Only viable if municipal water accessible
Option E: Expanded Rainwater (Large Roof Catchment)
Summary: Scale up rainwater harvesting with larger catchment area
System Design:
- Multiple roof surfaces: Tiny house + shed/greenhouse (40-60 m²)
- Larger storage: 8-10 × IBC tanks (8,000-10,000 L)
- Advanced filtration for potable use
- Overflow to irrigation pond/swale
Budget (Temperate climate example):
- IBC tanks (10×): €500-1,500
- Additional gutters/downspouts: €300-600
- Filtration (potable grade): €400-800
- Plumbing/manifolds: €300-600
- TOTAL: €1,500-3,500
Water Balance (Temperate 700mm, 50 m² catchment):
- Collected: 25,000-30,000 L/year
- Need: 21,000-42,000 L/year
- Gap: -4,000 to +17,000 L/year (may be self-sufficient to needing some delivery)
Realistic Annual Delivery Cost: €0-1,500/year (depending on usage)
Pros:
- Potentially self-sufficient in temperate climate
- No delivery dependency (or minimal)
- Scales with additional buildings
- Low ongoing costs
- Good for workshop/events (higher water needs)
Cons:
- Requires larger infrastructure (shed/greenhouse built first)
- More complex plumbing (multiple catchments)
- Large storage footprint (10 IBC tanks visible)
- Upfront cost higher (€1.5-3.5k)
Best If:
- Budget allows €2-3k for water setup
- Planning to build shed/greenhouse Year 1-2
- Want to minimize delivery dependency
- Temperate climate (Mediterranean still needs delivery due to lower rainfall)
- Space available for large tank storage
Status: Possible Year 2-3 expansion after initial buildings established
Water Decision Criteria
Choose between options based on:
-
Location climate?
- Temperate (700mm+) → Option A, C, D, or E
- Mediterranean (400-600mm) → Option B, C, or D (rainwater alone insufficient)
-
Is municipal water or well possible at site?
- Municipal accessible + connection < €2k → Option D strong candidate
- Aquifer confirmed + budget €5-10k → Option C eliminates delivery costs
- Neither → Must use rainwater + delivery (A, B, or E)
-
What's water setup budget?
- < €2k → Option A or B (basic rainwater + delivery)
- €2-5k → Option C (well) or E (expanded rainwater)
- < €1k → May need delivery-only Year 1, add rainwater Year 2
-
Can tolerate ongoing delivery costs?
- Yes (€1-3k/year acceptable) → Options A or B simple and low upfront
- No (prefer higher upfront, low ongoing) → Option C (well) if possible
-
Long-term plan (5+ years)?
- Yes → Option C (well) worth investment
- No (testing 1-2 years) → Options A/B (low commitment)
Current Status:
- Decided: Need water system capable of 20-40k L/year for 2 people + restoration
- TBD: Exact option (A/B/C/D/E) pending site selection and climate
- Most Likely: Option A (temperate) or B (Mediterranean) with rainwater + delivery
- Decision timing: Finalize within 2 weeks of site selection (geological survey for well, municipal access check)
What We're NOT Doing in Bootstrap Phase (And Why)
❌ Atmospheric Water Generator (AWG) - Not in Bootstrap Plan:
- Cost: €15,000-30,000 (10-20× rainwater cost)
- Energy: 5-10 kW solar required (doubles solar budget)
- Output: 100-500 L/day (still insufficient for all needs)
- Complexity: High maintenance, technical expertise
- Bootstrap Verdict: Not viable at bootstrap scale (€20-30k total budget)
- Future Vision: Creating water from air using solar energy remains a long-term aspiration - a sustainable water source that doesn't depend on rainfall or wells. This is part of the vision layer, not the bootstrap execution plan.
❌ Desalination:
- Only relevant for coastal brackish/saltwater (site-dependent)
- Cost: €5,000-15,000 for small system
- Energy-intensive (high solar requirement)
- Verdict: Not applicable unless coastal site with no other water source
Why Rainwater + Delivery (or Well) Makes Sense for Bootstrap:
- Total cost: €1,000-5,000 setup vs €15k+ for AWG
- Simple, proven, maintainable
- Expandable as budget allows (add tanks, larger catchment)
- Works with existing infrastructure
- Status: Bootstrap reality - what we're actually doing Year 1-3
🌟 Future Vision: Advanced Water Technologies (Years 5-10+)
These are long-term aspirations, not budgeted or planned, but something to work towards:
- Atmospheric Water Generation: Creating water from air using solar energy - sustainable, independent water source
- Advanced Water Storage: Large-scale reservoirs for wildlife and ecosystem support
- Smart Water Management: Automated systems optimizing water use across the site
- Water Quality Enhancement: Advanced filtration and treatment systems
Status: Vision layer - aspirational technologies that inform long-term direction but don't drive immediate planning. These become viable when:
- Project has proven success and stable revenue (€50k+/year)
- Technology costs decrease or efficiency improves
- Site expansion justifies larger infrastructure investments
- Specific need emerges that justifies the investment
Current Focus: Bootstrap-appropriate rainwater harvesting and delivery systems that work within €20-30k Year 1 budget.
📡 Internet & Communications
Vision: Reliable Internet for Remote Work and Outreach
Core Requirements:
- Sufficient speed for video calls, file upload/download (10+ Mbps)
- Reliable uptime for remote work (founders maintain jobs Year 1-2)
- Works at off-grid rural sites (no fiber/cable infrastructure)
- Affordable monthly cost (< €100/month)
Option A: Starlink Satellite Internet (Primary)
Summary: Satellite internet for remote locations, reliable high-speed
Specs:
- Setup cost: €450-650 (hardware purchase)
- Monthly: €40-65 (residential plan, varies by country)
- Speed: 50-200 Mbps typical
- Latency: 20-40ms (adequate for video calls)
- Power: 50-80W average (1.2-2 kWh/day)
Pros:
- Works anywhere in Europe (no ground infrastructure needed)
- Reliable for remote work (video calls, uploads)
- One-time hardware purchase, predictable monthly cost
- Fast setup (install dish, activate)
Cons:
- Requires clear sky view (trees can interfere)
- Power consumption (1-2 kWh/day = significant for small solar system)
- Monthly cost (€500-800/year)
- Dependent on Starlink service availability
Best If:
- Site is remote with no fiber/cable access
- Clear sky view available (not heavy forest)
- Solar system adequate (Option B or C can handle 1-2 kWh/day)
- Need reliable internet for work
Status: Primary option for remote off-grid sites
Annual Cost: €480-780/year
Option B: 4G/5G Mobile Internet (Primary or Backup)
Summary: Mobile data connection via smartphone hotspot or dedicated router
Specs:
- Setup: €0-200 (use existing phone or buy 4G/5G router)
- Monthly: €20-50 (unlimited or high-data plan, varies by country/carrier)
- Speed: 10-100 Mbps (location and signal dependent)
- Latency: 20-60ms
- Power: 5-15W (minimal, 0.1-0.4 kWh/day)
Pros:
- Very low power consumption (vs Starlink)
- Lower monthly cost (€20-50 vs €40-65)
- Easy setup (SIM card, router/phone)
- Works as backup if Starlink fails
Cons:
- Requires good mobile signal at site (not guaranteed in rural areas)
- Speed/reliability varies by location and time
- Data caps possible (check "unlimited" fine print)
- May not support heavy video calls if signal weak
Best If:
- Site has good 4G/5G coverage (test before committing)
- Tight solar power budget (Option A minimal solar)
- Lower monthly cost priority
- Use as backup to Starlink
Status: Check coverage at site before deciding - Could be primary if signal strong, or backup to Starlink
Annual Cost: €240-600/year
Option C: Hybrid (Starlink + 4G/5G Backup)
Summary: Starlink primary, mobile data as backup and power-saving option
Setup:
- Starlink for regular work (high reliability, speed)
- 4G/5G for backup and low-power days (winter solar constraints)
- Switch based on power availability and needs
Cost:
- Setup: €450-850 (Starlink + router)
- Monthly: €60-115 (both services active)
Pros:
- Maximum reliability (two independent connections)
- Power flexibility (use 4G on low-solar days)
- Backup redundancy for critical work
Cons:
- Higher monthly cost (€720-1,380/year)
- Complexity (manage two services)
Best If:
- Remote work critical (founders income dependent)
- Budget allows €60-115/month
- Site has adequate 4G/5G signal
- Want maximum reliability and backup
Status: Possible if work criticality justifies cost
Annual Cost: €720-1,380/year
Decision Criteria: Internet
-
Is mobile coverage adequate at site?
- Yes + strong 4G/5G → Option B viable, or use as backup
- No → Option A (Starlink) required
-
What's solar power capacity?
- Minimal (Option A solar) → Option B (mobile) better (low power)
- Adequate (Option B/C solar) → Option A (Starlink) manageable
-
How critical is internet for work?
- Critical (founders work remotely) → Option C (hybrid backup)
- Important but flexible → Option A or B
-
Monthly budget available?
- < €50/month → Option B (mobile)
- €50-100/month → Option A or C
Current Status: TBD - Test mobile coverage at site, default to Starlink if remote
Communication Tools (Software - free/low-cost):
- Video calls: Zoom, Google Meet (free tiers)
- Project management: Trello, Notion (free)
- Cloud storage: Google Drive (free 15GB)
- Email: Gmail (free)
- Website: WordPress.com (€100-300/year)
Annual Digital Services Cost: €100-500/year
→ Digital presence: Online Strategy
📊 Monitoring & Data Collection - Tiered by Budget
Vision: Track Restoration Progress and Demonstrate Impact
Core Requirements:
- Essential ecological data: tree survival, growth, basic biodiversity
- Photo documentation for communication and reporting
- Low-cost data collection (sustainable long-term)
- Sufficient rigor for credibility (if seeking grants/partnerships)
Tier 1: Essential Monitoring (€200-800) - Year 1 Minimum
Summary: Founder-collected data, minimal equipment, adequate for basic tracking
Equipment:
- Basic weather station: Temperature, humidity, rainfall (€50-150)
- Smartphone camera: Photo documentation (already owned, €0)
- Notebook + spreadsheet: Observations, data entry (€10-30)
- GPS app: Location tagging (free apps)
- 1-2 trail cameras: Wildlife monitoring (€100-300 each)
Data Collected:
- Tree planting: Count, species, location (GPS coordinates)
- Survival rate: Annual surveys (count living/dead)
- Growth: Height measurements (tape measure, €10)
- Weather: Daily/weekly rainfall, temperature (automated station)
- Wildlife: Camera trap photos (species presence)
- Photos: Quarterly site documentation (smartphone)
- Observations: Phenology, flowering, insects (notebook)
Budget: €200-800 total
Pros:
- Very low cost (fits any budget)
- Simple, maintainable by founders
- Adequate for basic progress tracking
- Sufficient for social media updates, basic reporting
- No specialized training needed
Cons:
- Limited scientific rigor (no soil analysis, biodiversity transects)
- Manual data entry (time-consuming)
- No automated/continuous monitoring
- May not satisfy scientific grant requirements
Best If:
- Budget constrained (Year 1 total < €15k)
- Primarily communicating to public/donors (not scientific audience)
- Founders have limited ecological monitoring experience
- Goal is proof of concept (not research publication)
Status: Minimum baseline - Every budget scenario includes Tier 1
Tier 2: Moderate Monitoring (€1,500-3,500) - Year 2-3 with Revenue
Summary: Add soil health, water quality, basic biodiversity surveys
Additional Equipment (beyond Tier 1):
- Soil test kit: NPK, pH, organic matter (€200-500)
- Lab soil analysis: 2-4 samples/year professional testing (€100-300/year)
- Water quality meter: pH, EC, dissolved oxygen (€100-300)
- Plant ID tools: Field guides, apps (€50-100)
- Biodiversity survey tools: Insect nets, quadrats (€100-300)
- 3-5 more trail cameras: Better wildlife coverage (€300-1,000)
- Solar-powered camera traps: Reduce battery changes (€200-400 each, optional)
Data Collected (all Tier 1 plus):
- Soil health: Annual tests (NPK, pH, organic matter, microbial activity)
- Water quality: Monthly tests (rainfall, runoff, pond if applicable)
- Biodiversity: Species counts (plants, insects, birds - transects)
- Vegetation structure: Canopy cover, understory density (measurements)
- Carbon: Simple estimation models (not lab verification)
Budget: €1,500-3,500 additional (€1,700-4,300 total with Tier 1)
Annual Ongoing: €200-500/year (lab tests, equipment replacement)
Pros:
- Scientifically credible data for grant applications
- Soil health tracking guides management decisions
- Biodiversity evidence shows ecosystem recovery
- Water quality data valuable for watershed context
- Better documentation for partnerships (universities, NGOs)
Cons:
- Higher cost (€1.5-3.5k upfront + €200-500/year)
- Requires more time (soil/water sampling, biodiversity surveys)
- Some training needed (species ID, survey protocols)
Best If:
- Year 2-3 with revenue (€5-10k/year project income)
- Seeking scientific grants or university partnerships
- Want credible data for expansion/replication
- Founders interested in deeper ecological monitoring
Status: Target for Year 2-3 if crowdfunding/revenue allows
Tier 3: Comprehensive Monitoring (€5,000-12,000) - Partnership/Grant-Funded
Summary: Research-grade monitoring, often funded by grant or university collaboration
Additional Equipment (beyond Tier 1 + 2):
- Drone: Aerial surveys, NDVI mapping (€500-2,000)
- Soil sensors: Moisture, temperature at multiple depths (€500-1,500)
- Data loggers: Automated continuous monitoring (€1,000-2,000)
- Advanced biodiversity tools: Acoustic recorders (bats, birds), eDNA sampling kits (€1,000-3,000)
- Carbon verification: Professional soil carbon analysis (€1,000-3,000/year)
- Weather station upgrade: Full meteorological suite (€500-1,500)
Data Collected (all Tier 1 + 2 plus):
- Aerial imagery: Quarterly drone surveys (canopy cover, NDVI, change detection)
- Continuous soil data: Moisture, temperature (hourly/daily automated)
- Acoustic monitoring: Bird/bat species identification (automated AI analysis)
- eDNA: Soil biodiversity (microbial, invertebrate DNA sequencing)
- Carbon sequestration: Lab-verified soil carbon stock changes
- Microclimate: Full weather data (wind, solar radiation, etc.)
Budget: €5,000-12,000 additional (€6,700-16,300 total)
Annual Ongoing: €1,000-3,000/year (drone surveys, lab analysis, sensor maintenance)
Pros:
- Research-publication quality data
- Strong evidence for impact (carbon, biodiversity)
- Attractive to major grants and partnerships
- Automated data reduces founder time burden
- Cutting-edge technology (credibility, PR value)
Cons:
- Very high cost (€5-12k upfront + €1-3k/year ongoing)
- Requires training (drone operation, data analysis)
- Complex data management (software, storage)
- Overkill for 1-hectare pilot site
Best If:
- Major grant awarded (€20-50k) that includes monitoring budget
- University partnership provides equipment/expertise
- Goal includes scientific publication or carbon credit verification
- Scaling plan requires robust data for replication
Status: Only if grant/partnership funds it - Not viable from crowdfunding alone
Monitoring Decision Criteria
-
What's Year 1 budget after land and infrastructure?
- < €15k total → Tier 1 only
- €15-25k total → Tier 1, consider Tier 2 in Year 2
- €25k+ or grant → Tier 2 immediately, Tier 3 if grant specifies
-
Who is primary audience for data?
- Public/donors (social media, blog) → Tier 1 sufficient
- Grant funders, scientific credibility → Tier 2 needed
- Research publication, carbon credits → Tier 3 required
-
Is university/research partnership possible?
- Yes → Partner may provide Tier 2/3 equipment/expertise (cost-sharing)
- No → Budget determines tier
-
Founders' monitoring experience?
- Beginner → Tier 1 (learn first year, upgrade later)
- Some experience → Tier 2 viable
- Expert or partnered → Tier 3 possible
Current Status:
- Year 1: Tier 1 essential monitoring (€200-800)
- Year 2-3: Upgrade to Tier 2 if revenue €5-10k/year or grant awarded
- Tier 3: Only if partnership/grant provides funding and expertise
Detailed Equipment Specs: Deferred until tier selected and budget confirmed
Citizen Science Integration (Free)
Use Existing Platforms (zero development cost):
- iNaturalist: Species ID, observations, community verification
- eBird: Bird surveys and monitoring
- Pl@ntNet: Plant identification
- Google Forms: Volunteer data collection
- Social Media: Instagram, Facebook for photo updates
Benefits:
- No development cost (platforms already built)
- Large communities for species ID help
- Data sharing and collaboration
- Educational engagement built-in
Status: Use regardless of monitoring tier (complements all levels)
🛠️ Tools & Equipment
Vision: Essential Tools for Restoration Work
Core Requirements:
- Hand tools for planting, weeding, basic maintenance
- Power tools for fencing, infrastructure, occasional heavy work
- Irrigation equipment for plant establishment
- Storage/workshop for tool maintenance
Year 1 Essential Tools (€800-2,000)
Hand Tools (€200-500):
- Shovels, spades, digging forks (€80-150)
- Rakes, hoes, pruners, loppers (€80-150)
- Wheelbarrow or garden cart (€50-100)
- Measuring tapes, marking flags, stakes ( €30-60)
- Watering cans, buckets (€30-50)
Power Tools - Battery-Powered (€400-1,000):
- Cordless drill/driver: 18V (€80-200)
- Cordless chainsaw: Small (€150-400)
- Hedge trimmer or brush cutter (€80-250)
- Extra batteries (€50-150)
- Rationale: Battery tools powered by solar (charge from system), no generator needed
Irrigation Equipment (€200-500):
- Garden hose 50-100m + fittings (€50-150)
- Small 12V DC water pump (solar-compatible) (€100-250)
- Drip irrigation starter kit (€50-200)
- Watering wands, nozzles (€20-50)
Total Year 1 Tools: €800-2,000
Status: Essential in any budget scenario
Year 2-3 Expansion (€1,000-3,000)
Workshop Setup (€500-1,500):
- Workbench (DIY or purchase) (€100-400)
- Tool storage cabinets/pegboard (€100-300)
- LED lighting (€50-100)
- Small wood stove for heat (optional, €200-500)
Storage (€500-2,000):
- Garden shed or cargo container (€500-2,000)
- Shelving for materials (€100-300)
Additional Tools (as needed):
- Larger chainsaw (if heavy tree work) (€200-500)
- Tiller or broadfork (soil prep) (€100-300)
- Fencing tools (post driver, wire tensioner) (€100-250)
Status: Add as revenue allows, not Year 1 critical
💻 Office & Digital Infrastructure
Computer Equipment
Assume Already Owned (€0):
- 2 laptops (founders bring existing)
- 2 smartphones (founders bring existing)
Year 1 Minimal New Purchases (€100-300):
- Backup external hard drives: 2TB (€80-150)
- Office supplies: Notebooks, printer paper (€20-50)
- Optional: Small printer (€80-150)
Year 2-3 Optional:
- Extra monitor for workspace (€100-250)
- Better camera for content creation (€200-600)
Budget: €100-300 Year 1, €300-850 over 3 years
Software & Services (Annual)
Free/Low-Cost Tools:
- Project management: Trello, Notion (free tiers)
- Accounting: Wave Accounting, GnuCash (free)
- Documents: Google Workspace (free), LibreOffice (free)
- Email: Gmail (free) or ProtonMail (free)
- Website: WordPress.com (€0-100/year basic site)
Paid Services (optional):
- Domain name: €10-20/year
- Professional email: €5-10/month (€60-120/year)
- Cloud storage upgrade: €10-20/month (€120-240/year)
- Website hosting upgrade: €50-150/year (if traffic grows)
Annual Software/Services Cost: €100-500/year
Status: Start with free tiers Year 1, upgrade if revenue justifies
🎯 Technology Budget Summary - By Total Budget Scenario
Scenario A: Ultra-Lean (€10-12k Total Budget)
Technology Allocation: €3,000-4,500 (30-40% of total)
| Category | Choice | Cost |
|---|---|---|
| Solar & Power | Option A (Minimal) | €800-1,500 |
| Water Systems | Rainwater + Delivery | €700-2,000 |
| Internet | 4G/5G Mobile (low power) | €0-200 setup |
| Monitoring | Tier 1 (Essential) | €200-800 |
| Tools & Equipment | Year 1 Essential | €800-1,500 |
| Office/Digital | Minimal | €100-200 |
| TOTAL TECHNOLOGY | €2,600-6,200 |
Plus Annual Operating:
- Internet: €240-600/year
- Water delivery: €1,000-2,500/year
- Software: €100-300/year
- Annual: €1,340-3,400/year
Trade-offs: No refrigeration, very basic power, high dependency on water delivery, minimal monitoring
Best If: Testing concept for 1-2 years, comfortable with very simple living, plan to upgrade Year 2-3
Scenario B: Standard Bootstrap (€15-20k Total Budget)
Technology Allocation: €6,000-9,000 (35-45% of total)
| Category | Choice | Cost |
|---|---|---|
| Solar & Power | Option B (Basic Comfort) | €4,000-5,500 |
| Water Systems | Rainwater + Delivery | €700-2,100 |
| Internet | Starlink | €450-650 setup |
| Monitoring | Tier 1, upgrade to 2 in Year 2 | €200-800 |
| Tools & Equipment | Year 1 Essential | €800-2,000 |
| Office/Digital | Minimal | €100-300 |
| TOTAL TECHNOLOGY | €6,250-11,350 |
Plus Annual Operating:
- Internet: €480-780/year (Starlink)
- Water delivery: €1,000-2,500/year
- Software: €100-500/year
- Annual: €1,580-3,780/year
Trade-offs: Comfortable living, adequate power (fridge, internet), rainwater + delivery for water, basic monitoring
Best If: Crowdfunding reaches €15-20k target, planning 3-5 year operation, want comfortable sustainable living
Status: Most likely scenario if crowdfunding successful
Scenario C: Well-Funded (€25-30k Total Budget)
Technology Allocation: €10,000-15,000 (35-50% of total)
| Category | Choice | Cost |
|---|---|---|
| Solar & Power | Option C (Full Off-Grid) | €10,000-14,000 |
| Water Systems | Well Drilling (if aquifer) OR Expanded Rainwater | €4,000-10,000 OR €1,500-3,500 |
| Internet | Starlink + 4G backup | €450-850 setup |
| Monitoring | Tier 2 (Moderate) | €1,700-4,300 |
| Tools & Equipment | Year 1 + some Year 2 expansion | €1,500-3,500 |
| Office/Digital | Moderate | €200-600 |
| TOTAL TECHNOLOGY | €17,850-36,250 (exceeds budget - prioritize) |
Realistic C Scenario (prioritized to fit €25-30k total):
- Solar: Option B+ (€5-7k) - NOT full Option C
- Water: Well (€5-8k) OR Municipal (€1-3k) if available
- Internet: Starlink (€500-700)
- Monitoring: Tier 2 (€1.5-3k)
- Tools: Year 1 (€1-2k)
- TOTAL: €13,000-20,700
Plus Annual Operating:
- Internet: €720-1,380/year (Starlink + backup)
- Water: €50-200/year (well) OR €180-560/year (municipal)
- Software: €200-500/year
- Annual: €970-2,080/year (lower than A/B due to well/municipal water)
Best If: Major grant (€20-50k) OR crowdfunding exceeds €25k, long-term commitment (5+ years), want maximum reliability
Decision Framework: Which Technology Scenario?
Determined by:
- Total budget after land purchase? → Dictates scenario (A/B/C)
- Location climate? → Temperate vs Mediterranean water strategy
- Site conditions? → Grid access? Well possible? Municipal water?
- Timeline commitment? → 1-2 years (lean toward A), 5+ years (justify C)
Current Status:
- Planning for Scenario B (€15-20k, standard bootstrap) as baseline
- Flexible to Scenario A if crowdfunding falls short
- Flexible to Scenario C if major grant or crowdfunding exceeds expectations
- Final technology decisions: Deferred until total budget and site confirmed (Month 6-9)
🔄 Adaptation Philosophy
This document presents OPTIONS, not a fixed plan.
Technology decisions adapt to:
- Budget reality: What funding actually materializes (crowdfunding/grant/bootstrap)
- Site conditions: Grid access, aquifer, municipal water, mobile coverage
- Location climate: Temperate vs Mediterranean (water, solar production)
- Founders' skills: DIY capability vs need for professional installation
- Partnerships: University/NGO may provide monitoring equipment
- Year 1 learnings: Actual power/water usage may differ from estimates
Defer detailed specifications until:
- Total budget confirmed (Month 6-9 after fundraising)
- Site selected and surveyed (geological, infrastructure access assessed)
- Location/climate determined (temperate vs Mediterranean)
At that point:
- Select solar option (A/B/C/D) based on budget and site
- Select water option (A/B/C/D/E) based on climate, budget, site conditions
- Choose internet (Starlink vs mobile vs hybrid) based on coverage testing
- Determine monitoring tier (1/2/3) based on budget and audience
- Purchase specific equipment based on best available products at that time
Current Status: Framework established, specific decisions TBD when context clarifies
Technology Integration: Flexible pathways ready to adapt to opportunities and constraints as they emerge
→ Complete budget: Financial Overview → Housing integration: Living Infrastructure → Restoration methods: Water Management → Timeline: Implementation Timeline